All

Project management dynamic buffersystems

July 22, 2022

Hyperbaric chamber certification

February 27, 2022

Hyperbaric Lifeboat renovation

August 18, 2021

CO2 system for process chamber

October 22, 2020

New Sea lock IJmuiden

November 19, 2019

Filling system non-food industry

June 1, 2019

NEN 3140 Inspection and maintenance oven

May 1, 2019

Diving tower

January 1, 2019

Installation Wet Bell

December 1, 2018

Umbilical repair

August 6, 2018

Commissioning drilling towers

June 11, 2018

Electrical installation of Automated Guided Vehicles (AGV)

May 1, 2018

Deep Sea Mining

May 1, 2018

Commissioning double deck linkspan in England

April 25, 2018

Repair of umbilicals

April 12, 2018

Several Life Support systems

March 1, 2018

Electrical installation drilling towers

February 8, 2018

Installation double deck linkspan

January 25, 2018

Slipring unit

Revision of both slipring units for M/S Thialf

January 1, 2018

Mobile SAT system

Renovation of mobile SAT system

May 1, 2017

Electrical installation on 72 hyperbaric lifeboats

January 1, 2017

Umbilical winch and Wet Bell system

Umbilical winch and Wet Bell system installation

May 1, 2016

Dive bell renovation

June 1, 2015

Installation cranes

Electrical installation cranes

January 1, 2014

Inside the control cabinet of a mobile dredger-unit

Electrical installation on mobile dredger-unit

July 1, 2013

Umbilical winch

Repair umbilical winch M/S Protea

June 1, 2013

Electrical renovation hyperbaric chamber

June 1, 2012

ROV

Repairment ROV of M/S Rollingstone

November 1, 2011

Manipulator arm

Electrical installation of manipulator arm

June 1, 2011

Decompression chambers

Installation of decompression chambers and air compressors

May 1, 2011

Modifications on Self Propelled Hyperbaric Lifeboat

May 1, 2010

Electrotechnical building of life support containers

April 1, 2010

Electrical modification on Self Propelled Hyperbaric Lifeboat

January 1, 2010

Electrical systems on mini submarines

January 1, 2010

DP Status alarm panel

Engineering and assembly of DP alarm system

January 1, 2009

Installing and commissioning SPHL interface cabinet

January 1, 2009

Electrical work on a dredging system

Electrical work on dredger M/V Argonaut

January 1, 2009

Electrical work on a dredging system

Dredging automation

January 1, 2009

Installing and commissioning a ship gyro

May 1, 2008

Control centre simulator

Revision Dredge simulator

April 1, 2008

Renovation mobile SAT system

April 1, 2008

Mobile saturation system

Electric mobilisation of Mobile Saturation Unit

January 1, 2008

M/S Coronaut

Electrician work on the M/S Argonaut and M/S Coronaut

January 1, 2008

Video unit

Diving videocases with recording equipment

January 1, 2008

Installing acoustic improvement systems in a theatre

January 1, 2008

Installing and commissioning of dredging computers

February 1, 2007

Rebuilding the complete paperline

Dismantling and rebuilding of paperline machine

January 1, 2006